989 results found
Featured results
More results
Australia’s national government introduced policy to incentivise asset recycling / capital recycling by state-level governments, offering up to 15% of the sale or lease proceeds of asset privatisations for re-investment in infrastructure projects. Since 2014, the State of New South Wales has raised AUD32.7 billion through asset recycling.
The Kidston Pumped Storage Hydro project is the first pumped hydro energy storage scheme globally to be developed in an abandoned gold mine. The giant battery located in Kidston, Far-North Queensland will pump water uphill when energy is abundant during off peak periods and releasing it to create power in times of peak demand. The Kidston project is supported by NAIF’s 15-year concessional loan of AUD610m (USD475 million) - debt finance. Genex will provide AUD120 million (USD93 million), including AUD25 million (USD19.5 million) investment by J-Power -equity finance.
The 300MV Victorian Big Battery is currently to be Australia’s largest lithium-ion battery which assists in providing critical grid support services, reducing wholesale power costs for consumers and assisting in the transition to renewable energy in Victoria, Australia. It utilises the System Integrity Protection Scheme (SIPS) which increases import capacity to Victoria by up to 250 MW, reducing the likelihood of unserved energy (USE) from high impact, low probability (HILP) events during summer periods.
Today, the GI Hub has launched a new resource that shows how G20 governments are spending the USD3.2 trillion in infrastructure as a stimulus.
This research helps governments and industry ensure that infrastructure investment supports climate mitigation and adaptation, resilience, and inclusive outcomes during challenging economic times.
Technological innovation could fill 60% of the infrastructure investment gap, but first we need to address the barriers to financing. On 17 November 2021, the GI Hub is hosting Financing InfraTech for the Climate Transition to explore solutions to galvanise infrastructure technology adoption at scale.
The pandemic increased inequalities among vulnerable people and highlighted gaps in access to financing and services in every country. Simultaneously, the climate crisis is still at ‘code red’. From every vantage point, it is clear that we need to get the most possible out of the unprecedented level of infrastructure as a stimulus.
The recording is now available for the GI Hub and International Finance Corporation (IFC) webinar ‘Infrastructure for the recovery: Innovation for de-risking greenfield investment’, the third in the series New Deals: Funding solutions for the future of infrastructure.
Sydney Metro Northwest is Australia’s first fully automated driverless metro railway. A 36 km link servicing Sydney’s north-west, it includes eight new railway stations and an upgrade to five existing stations. The Operations, Trains and Systems (OTS) component of the project was delivered under a PPP contract.
Infrastructure Monitor is the GI Hub's annual flagship report on the state of investment in infrastructure.
Infrastructure Monitor is the GI Hub's flagship report on the state of investment in infrastructure. The 2021 report examines global private investment in infrastructure projects, infrastructure investment performance, project preparation, ESG factors in infrastructure investment, and COVID-19 impacts.
To close the infrastructure gap in a sustainable recovery, we need more greenfield infrastructure, with environmental sustainability at its core. This requires innovative funding models and public-private partnerships (PPPs), particularly in emerging economies where private investors are more reluctant to invest and greenfield infrastructure need is greatest.
On 19 January, the Global Infrastructure Hub hosted a seminar in collaboration with the G20 Infrastructure Working Group (IWG) on ‘Scaling up sustainable infrastructure investment by leveraging private sector participation’.
Infrastructure NSW works behind the scenes to support these goals. Since 2015, one of our major tools has been the Infrastructure Investor Assurance Framework (IIAF).
Procuring agencies will assess the early contractor involvement (ECI) procurement model as part of the procurement options analysis on complex major infrastructure projects, where there is significant unknown scope, risks or interfaces, or a need for accelerated delivery timeframes.
A set of practice note encourages a staged assessment of the potential benefits from delivery of an early works packaging strategy to be undertaken early in the planning phase on all major infrastructure construction projects.
This resource consists of a variety of options available to address the principle as applicable to the particular circumstances of a project.
This document explains the stages of project development and the level of detail that may be confidently provided to the public at each stage.
The policy framework for investment provides a systematic approach for improving investment conditions and a comprehensive checklist of key policy issues for consideration by any government interested in creating an enabling environment for all types of investment.