137 results found
Taiyuan, like most northern cities in China, faces a serious shortage of clean heating and heat sources. Under the double pressure of environmental protection and people's livelihood, the Taiyuan government has adopted a low-cost, low energy consumption, environmental protection, which takes into account environment, peoples? livelihood and safety such as the Gujiao power plant, a long-distance transmission heat supply project using waste disposal heat.
G20 finance ministers and central bank governors developed a set of leading practices to promote and prioritize quality infrastructure investment.
Alenka Enerji Uretim ve Yatirim A.S. (the borrower), Borusan EnBW Enerji Yatirim ve Uretim A.S. (the shareholder), ICBC Turkey and EBRD (co-lenders), Vestas (the turbine supplier and O&M contractor), TEIAS (system operator).
Two senior loans totaling up to EUR 243.5 million in local currency equivalent with a 6-year tenor (the ?Loans?) to the state-owned companies Intergas Central Asia JSC (KZT 53.9BN and EUR 100MM in Kazakh tenge equivalent) (?ICA?) and Kaz TransGas Aimak JSC (KZT 12.9BN) (?KTGA?), the Bank?s existing clients and fully owned subsidiaries of KazTransGas JSC (the ?Sponsor?, ?KTG?), the national gas operator of Kazakhstan.
Size: Capacity to produce up to500 KTA of Pure CO2 product (food grade)) Brownfield: Parties involved (public and private): private: Saudi Basic Industries Corporation (SABIC) Relevant contractual details (type (concession, BOT, PPP etc
The project entails financing of USD 30mm in Kazakh tenge equivalent from the EBRD and up to USD 10.4mm in US dollar and euro equivalents from the Clean Technology Fund, and a USD 12mm in KZT equivalent from the ADB to Baikonur Solar LLP, owned 51% by the United Green Group, a privately-owned strategic investment group, and 49% by a subsidiary of a Kazakh state-owned development fund, for the development, construction and operation of a ground-mounted fixed-installed solar photovoltaic power plant with a total capacity of up to 50MWp and an associated new substation in the Kyzylorda region of south Kazakhstan.
The Project alignment length is approximately 14.6 km and consists of a twin deck 2x2=4-lane road tunnel beneath the Bosphorus Strait connecting the European and Asian shores of Istanbul as well as widening of approximately 9 km of existing roads leading to the tunnel.
Parties involved: EBRD, European Union (?EU?), Kyrgyz Republic, Isfana City (the ?City?) and Municipal Enterprise Isfana Taza Suu (the ?Company?)
Drawing on examples and case studies, this report aims to provide a framework to optimise existing infrastructure assets and build new resilient infrastructure, including new strategies capable of ensuring quality and performance over the asset life-cycle.
The UAE?s Federal roads network contains a diverse variety and large quantity of assets. Based on this, the MoEI has detected the need of a comprehensive system to manage and operate the maintenance activities with the highest efficiency.
A Dedicated initiative co-curated by Small Island Developing States (SIDS) and CDRI partners to promote resilient, sustainable, and inclusive infrastructure development in SIDS
A series of methodologies and tools based on the evidence-based infrastructure (EBI) approach, helping governments assess and improve their capacity to plan, deliver and manage infrastructure systems.
The hub was developed by Statistic Canada in collaboration with Infrastructure Canada in 2018
Incheon Bridge is the world?s 5th longest cable-stayed sea crossings. It connects to 2nd and 3rd Kyungin and Seohaean expressway, and as a result shortens the journey time from Seoul metropolitan areas to Incheon Int?l Airport by 40 minutes.
The modernization of the Roca Railway has as main objective the renovation and electrification of the passenger service line Branch Constitution - La Plata, which has an extension of 52 km and moves 44 million people by year.
The IMF has compiled a suite of analysis, research, diagnostic tools, country reports, data sets, and other resources on the importance of public investment as a catalyst for economic growth.
The aim of this exercise is to better understand the landscape by cataloguing and mapping what already exists, acknowledging that the list will never be exhaustive.
Post-COP15, GI Hub's Strategic Adviser Denis Crevier explores some meaningful outcomes for biodiversity and its influence on infrastructure.
The guidelines and procedure for the formulation of the 2017-2022 Public Investment Program (PIP) provides a framework and process for the formulation of the PIP.
A sovereign loan of EUR 5.5 million to Georgia and a capital grant of EUR 1.5 million from the Eastern Europe Energy Efficiency and Environment Partnership (?E5P?) is supporting the City of Batumi and its municipal bus company Batumi Autotransport LLC to improve and modernise bus operations