This report indicates that although privatization, competitive restructuring, and regulatory reforms improve infrastructure performance, several issues must be considered and conditions met for these measures to achieve their public interest goals.
Modules 1-4 (out of nine modules) of the PPP Manual systematically guide public and private parties through the phases of PPP project preparation for national and provincial governments.
PIMAC, which leads the preparation of pre-feasibility studies in Korea, has prepared sector-specific guidelines for the preparation of pre-feasibility studies in accordance with the General Guidelines for Preliminary Feasibility Studies.