1740 results found
Featured results
More results
On Sao Paulo metropolitan train lines 8 and 9, a concession contract was issued for operation, maintenance, and upgrade of services and stations, and the supply of rolling stocks and signalling systems. The project attracted significant private sector participation.
Sydney Water’s new collaborative framework called ‘Partnering for Success (P4S)’ covered the appointment of long-term integrated planning partners in 2019 and a 10-year partnership with three regional delivery consortia (RDC) from 2020.
The AUD11 billion (USD8.2 billion) Melbourne Metro Tunnel Project involves the construction of twin 9 km rail tunnels through Melbourne’s central business district, in addition to five new underground stations along this route. The scope of the early works package included utility and telecommunication service relocations, site preparation works, and construction of two access shafts to allow the construction of the underground stations.
Rail Projects Victoria, a Victorian Government delivery authority, established the Victorian Tunnelling Centre (VTC), based on the Crossrail Tunnelling and Underground Construction Academy, London, to offer specialist training in the construction and operation of a variety of types of tunnels, including rail, road, and utilities tunnels.
The NSW Government faced a shortage of skilled workers and an ongoing lack of workforce diversity in the infrastructure industry – particularly with respect to women, Aboriginal and Torres Strait Islander people, and apprentices. The government, in consultation with the construction industry, mandated skills, training, and employment targets for all major government infrastructure projects.
The New South Wales (NSW) Government sought to upgrade a 155 km section of the Pacific Highway between Woolgoolga and Ballina. It adopted a d elivery partner model that repackaged the works and tender packages on a trade or activity basis, for a logical sequencing of works across the entire project.
In Chicago, the local government received requests for more libraries and community spaces, however, there was little to no funding available for the projects. Combining a new public library with affordable senior housing improves the value proposition of both projects as construction costs can be shared between levels of government. The library could not have been built on its own.
The Queensland Government needed to deliver eight new primary schools and two new secondary schools across South East Queensland to cater for up to 10,000 additional students and 650 staff as part of the growing demand for education in the region. The Queensland Government adopted a bundling approach within a public-private partnership (PPP) contract to ‘bundle’ the 10 smaller school assets under a PPP.
Rocky Flats was a United States nuclear weapons plant in Colorado. After production was halted in 1989, government agencies did not have the capability or capacity to close the plant as quickly desired. To accelerate the program and minimise cost, performance incentives were provided to the joint venture responsible for delivering the works.
The GI Hub today launches Improving Delivery Models, an initiative that showcases proven delivery model improvements that enhance the quality of infrastructure. Many of the challenges faced in delivering infrastructure can be traced back to the early-stage processes of choosing the delivery model and structuring the project.
Cities are at the forefront of the pandemic crisis and are key players in the fight to achieve net-zero emissions targets. The recovery choices they make today will set urban agendas for years to come.
Evidence-based improvements address common challenges in infrastructure delivery to change the way we deliver infrastructure, avoiding time and cost overruns and improving quality
This month the GIobal Infrastructure Hub (GI Hub) was delighted to participate in the second Africa Infrastructure Fellowship Program (AIFP). The capacity-building program is designed to upskill African government infrastructure specialists, enabling them to facilitate increased investment in a pipeline of new, sustainable infrastructure that has positive social and economic impact in African communities.
Watch the GI Hub and Jacobs webinar ‘Global practices and insights for improving infrastructure delivery models.’ The discussion explored GI Hub's new initiative Improving Delivery Models and highlighted lessons learnt by stakeholders behind the Grand Paris Express, Sydney Metro and Toronto Metrolinx projects.
The ACGF is an innovative finance facility dedicated to accelerating green infrastructure investment in Southeast Asia with over USD1.4 billion in loans from co-financing partners, under the ASEAN Infrastructure Fund (AIF). The ACGF’s technical assistance supports governments to identify and prepare commercially viable green infrastructure projects while the ACGF loans are utilised to cover upfront capital investment costs. This two-pronged approach ‘de-risks’ green infrastructure projects, making them more attractive to private capital investors.
Can investment in infrastructure fuel economic recovery? Is there a role for infrastructure in the transition to a circular economy? Hear what insights GI Hub's CEO, Marie Lam-Frendo shared in this interview for the official G20 Italy: The 2021 Rome Summit publication.
Due to rising energy prices, the Dutch Government has placed emphasis on meeting national energy performance objectives through the reduction of fossil fuel consumption. The Dutch Government is seeking innovative solutions to deliver more energy and cost-efficient buildings, as well as achieving Net Zero Energy buildings by 2020. The retrofits include installation of rooftop solar panels and other insulation technologies.
Euro Property Assessed Clean Energy (EuroPACE) is a scalable on-tax financing model to support the deployment of energy saving and generation technologies to European households and the EU’s clean energy transition. The scheme is inspired by the successful US PACE scheme that was introduced in 2008, which resulted in over USD4.7 billion in funded projects, over 200,000 homes over the past four years. Private capital is deployed as upfront financing to homeowners which is repaid through an additional special “assessment” payment on its property tax bill for a specified term.
ChargePoint as a Service installs electric vehicle (EV) chargers for no upfront cost in return for a fixed term subscription CPaaS reduces overhead costs and offer predictable operational expenses CPaaS also proactively monitors stations to identify and fix technical issues remotely and enables businesses to track performance and utilization. Georgia Power (a utilities company in Georgia) and Pivet Atlanta, an automotive company has partnered with ChargePoint to install EV chargers in a major travel corridor.