137 results found
Parties involved (public and private): Risen Energy (China) Co. Ltd. (The Developer), EBRD and Green Climate Fund (Lenders), Risen Energy (Hong Kong) Co. Ltd. (EPC Contractor), Financial Settlement Centre (the Offtaker).
UAE Ministry of Energy and Infrastructure in collaboration with the University of Sharjah, intended to develop new asphalt binder specifications for the UAE to help mitigate the environmental impacts of climate change by building a climate model and running different Intergovernmental Panel on Climate Change (IPCC) scenarios.
Toyama City is now a global role model as a Compact City, but Toyama used to be a typical Japanese city challenged by urban sprawl with an ageing and declining population
The QII Principles are voluntary, non-binding principles that reflect a common strategic direction and aspiration for quality infrastructure investment.
The QII Principles are voluntary, non-binding principles that reflect a common strategic direction and aspiration for quality infrastructure investment.
The project consists of a road concession procurement for exploiting infrastructure and public services provision for recovery, operation, maintenance, monitoring, conservation, implementation of improvements and maintenance of the service level of the BR-262/ES Highway, in the road section between BR-101 (B) - Viana/ES - up to the frontier between ES/MG; BR-262/MG, in the road section between ES/MG frontier with BR-381/MG - João Monlevade/MG; and BR-381/MG, in the road section between Belo Horizonte/MG to Governador Valadares/MG
It is the second bridge that crosses over to Cádiz from the mainland, after Carranza bridge, and one of the highest bridges in Europe, with a gauge of 69 meters and a total length of 5 kilometres
The program was initiated to develop industrial city in Sudair to support local investors and to attract international investment and to advance the national industry.
The Certification System's development brings together a wide range of experts including representatives of international financial, expert and civil organisations and associations such as the World Bank, the OECD and the World Wide Fund for Nature, consulting companies, leading infrastructure investors, executive authorities and other stakeholders.
This paper investigates the interaction between corruption and governance at the sector level.
How sustainable infrastructure is a key enabler of the transition to a low-carbon economy and an important driver of resilient, inclusive growth
Fukuoka City is one of the most prominent cities in Japan today
Parties involved (public and private): Egyptian National Railways ?ENR?, Ministry of Transport, Ministry of International Cooperation, Ministry of Finance.
EBRD together with the World Bank's Multilateral Insurance Guarantee Agency ("MIGA") has provided a joint credit enhancement scheme to enable the issuance of the first greenfield infrastructure project bond in Turkey.
A senior corporate loan of up to EUR 15 million to be divided into two parallel tranches (i) the EBRD tranche and (ii) a concessional tranche provided by the Green Energy Special Fund ("GESF"), a Special Fund established and administrated by the Bank with the contribution of the Taiwanese International Cooperation and Development Fund to support EBRD projects related to investments in efficient energy technologies
As is the case in other parts of Atlantic Canada, Bridgewater suffers from a very high rate of energy poverty ? when households spend a large portion of their income on energy needs.
Parties involved (public and private): The investment and construction of the project follows a "1 + 1 + X" model for investment and construction: 1 is the power company, 1 is the local government platform company, X is the social capital, which together forms the formation of multi-party joint platform company
Enerjisa Enerji A.S., one of the leading private utility players in Turkey, serving nearly a quarter of Turkey?s population.
A case study of social infrastructure for education facilities in Saudi Arabia.
PPP-Projects on Federal Highways, 5 Concessions (shadow toll) (2005-2011), 8 Availability-Projects (since 2009), 6 Availability-Projects in tender or pipeline (if efficient), widening from 4 to 6 lanes, mainly brownfield but as well some greenfield sections